MDO-61 - Toronto Bridge All on 6 at immediate load
Demonstrative upper model apts to the explanation of the Toronto Bridge All on 6 at immediate load, constituted by a transparent base with 6 implants, the posterior 2 have a 45 degrees inclination. The model has a circular structure in acrylic resin connected to the implants by 6 screws.
- Quantitative unit
- ks
![MDO-61 - Toronto můstek na 6 v bezprostředním zatížení MDO-61 - Toronto můstek na 6 v bezprostředním zatížení](https://www.helago-cz.com/files/thumbs/mod_eshop/produkty/full/31672.0.jpg)
MDO-61 - Toronto Bridge All on 6 at immediate load